← All local projects

Greenwich, CT

A.E. Schmidt storage and reinstallation in Greenwich

A 9-foot A.E. Schmidt pool table moved into storage until its Greenwich, CT, space was ready, then installed with new Navy Tour Edition 3030 cloth.

This 9-foot A.E. Schmidt in Greenwich, Connecticut, needed a period in storage before its space was ready. TableSmith moved the table into storage, then returned it to use with installation after the room was available.

The installation included new Tour Edition 3030 cloth in Navy. The photographs show the completed playing surface and the table from several angles after storage and installation.

A storage project has two sets of access details: getting the table into storage and getting it into the finished room. Include both locations, your table size and cloth preference when discussing a similar job. Brad can review the full scope before quoting.

Location
Greenwich, CT
Table
9-foot A.E. Schmidt
Cloth
New Navy Tour Edition 3030
The A.E. Schmidt installed after storage with new Navy cloth.
Navy Tour Edition 3030 cloth on the 9-foot table.
The installed table in its room.

Let’s plan the next step

Your table deserves careful work.

Moving? Complete the survey before a quote. For refelting or repairs, send a short inquiry with photos or call TableSmith.

CallRepairsMoving survey